{"product_id":"diamond-products-harness-display-wire-kit-35-pin-connector-w-8-inch-long-leads-15-total-cat-108687-1-part-no-6007572","title":"Diamond Products : HARNESS DISPLAY WIRE KIT 35 PIN CONNECTOR W\/8 INCH LONG LEADS 15 TOTAL CAT# 108687 1 Part No. 6007572","description":"\u003cp\u003e\u003cstrong\u003eDiamond Products Saws \u0026amp; Rigs OEM Spare Parts\u003c\/strong\u003e\u003c\/p\u003e\u003ctable width=\"100%\"\u003e \u003ctbody\u003e \u003ctr\u003e \u003ctd\u003e\u003cstrong\u003ePart No.\u003c\/strong\u003e\u003c\/td\u003e \u003ctd\u003e\u003cstrong\u003eDescription\u003c\/strong\u003e\u003c\/td\u003e \u003c\/tr\u003e \u003ctr\u003e \u003ctd\u003e6007572\u003c\/td\u003e \u003ctd\u003eHARNESS DISPLAY WIRE KIT 35 PIN CONNECTOR W\/8 INCH LONG LEADS 15 TOTAL CAT# 108687 1\u003c\/td\u003e \u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e","brand":"Diamond Products","offers":[{"title":"Default Title","offer_id":55494209012003,"sku":"6007572","price":471.42,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0263\/7070\/3438\/files\/diamond_products_parts_logo_final_2_dcd1d5f3-3369-425c-98fc-a970cf76c553.jpg?v=1787323943","url":"https:\/\/bladesdirect.net\/products\/diamond-products-harness-display-wire-kit-35-pin-connector-w-8-inch-long-leads-15-total-cat-108687-1-part-no-6007572","provider":"Blades Direct","version":"1.0","type":"link"}